Industrial Video »

Client: Mega Load Pvt. Ltd.

Location: Panipat (Haryana)

Shoots days: 12 (including day-night shifts)

Project Requirements »


Mega Load Pvt. Ltd. required an extensive shoot of 10-12 days/nights to cover the erection of a 1,700 tonne chimney with multiple cameras and aerial shoot.

Multiple camera setup, long-duration timelapse, ground and aerial shoot (videography + photography) along with editing with background score and text overlays.


The Final Video »



Select Photographs »

Perspective shot of the chimney

Night shot of the plant along with lights

Second perspective of chimney

Top down shot of the chimney

Sunset shot of the plant along with the chimney

The lifting of 1700 tonne chimney

Wide angle shot of the chimney and plant

Creative editing

Creative angle

Creative editing and drone shot